Paxton

With its beautiful arching design and carefully considered layout, Paxton is both architecturally impressive and incredibly practical.

Overview

With its eye-catching curved design, Paxton makes an instant impression on anyone who sees it. Its shape not only looks fantastic, but has a purpose. It creates a wide, airy central corridor, off which every classroom has a direct link to landscaped external space.

Learning resources are located at the heart of the design, adjacent to the main entrance, with intimate breakout spaces available throughout.

This highly sustainable building creates a safe, welcoming and comfortable learning environment, with natural ventilation and lots of daylight.

£4780000*

Total Cost

GIFA: 1,539m2

Rec site area: 14,179m2

40 Weeks

Construction Period

Preconstruction: 35 weeks

Construction: 40 weeks

£5515000*

Total Cost

GIFA: 1,915m2

Rec site area: 18,051m2

44 Weeks

Construction Period

Preconstruction: 35 weeks

Construction: 44 weeks

* Includes a location factor adjustment of £ (+%)

Right, we've taken note of your choices, please enter your name, email address and phone number and someone will be in contact.

Paxton - at a glance
Form entry options
1.5-form and 2-form entry.
Fixed low cost
£3.995m for a 1.5-form entry.
Fast delivery
40 weeks’ construction for a 1.5-form entry.
Attractive design
Stunning design creates an exceptional learning environment.
Paxton 1.5FE
Paxton 2FE
St. Andrew’s C of E Lower School

An increase in residential schemes in Biggleswade created the need for more school places in the area and an additional site to the well-established St Andrew’s C of E Lower School.

Full Case Study
Lego Goes Here